国产成人亚洲精品狼色在线-国产成人亚洲精品青草天美-国产成人亚洲精品无码av大片-国产成人亚洲精品无码h在线-国产成人亚洲精品无码车a-国产成人亚洲精品无码影院bt

您好,歡迎來到深圳市眾達(dá)鋁制品裝飾有限公司官網(wǎng)!
深圳市眾達(dá)鋁制品裝飾有限公司
一家集設(shè)計(jì)、生產(chǎn)、安裝、表面涂裝于一體的全方位優(yōu)秀企業(yè)
全國服務(wù)熱線
86-755-23499577
網(wǎng)站首頁 - News - 行業(yè)新聞 - Matters needing attention in installation of aluminum honeycomb curtain wall
推薦產(chǎn)品
Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4482
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.szygs.cn

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達(dá)鋁制品裝飾有限公司    粵ICP備14077854號
主站蜘蛛池模板: 成人看的午夜免费毛片| 啪啪啦资源站永久| 手机在线观看你懂的| 在线亚洲观看| 日本红怡院亚洲红怡院最新| 亚洲欧美人成网站综合在线| 免费a大片| 午夜爱爱小视频| 狠狠色网| 天天伊人| 国外一级毛片| 天天爆操| 狠狠天天| 五月天堂婷婷| 久草色香蕉| 婷婷婷色| 久久鲁视频| 无码日韩精品一区二区免费| 黄色永久免费| 天天做.天天爱.天天综合网| 国内精品视频在线| 天天看片夜夜爽| 黑人影院| 午夜看片网| 免费亚洲视频在线观看| 亚欧精品一区二区三区四区| 免费看欧美理论片在线| 羞羞答答免费人成黄页在线观看国产| 老师别揉我胸啊嗯上课呢视频| 午夜日韩视频| 免费爱做网站在线看| 亚洲成人日韩| 欧美在线高清视频| 一级十八以 下岁女子毛片| 青青草97| 综合啪啪| 四虎 2022 永久网站| 狠狠做深爱婷婷综合一区| 午夜色视频| 欧洲免费极品videos| 中文字幕欧美在线观看|