国产成人亚洲精品狼色在线-国产成人亚洲精品青草天美-国产成人亚洲精品无码av大片-国产成人亚洲精品无码h在线-国产成人亚洲精品无码车a-国产成人亚洲精品无码影院bt

您好,歡迎來到深圳市眾達鋁制品裝飾有限公司官網(wǎng)!
深圳市眾達鋁制品裝飾有限公司
一家集設(shè)計、生產(chǎn)、安裝、表面涂裝于一體的全方位優(yōu)秀企業(yè)
全國服務(wù)熱線
86-755-23499577
網(wǎng)站首頁 - News - 行業(yè)新聞 - Matters needing attention in installation of aluminum honeycomb curtain wall
推薦產(chǎn)品
Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4490
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.szygs.cn

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
主站蜘蛛池模板: 深夜视频在线观看免费| 日韩永久免费视频| 亚洲爱色| 91免费视频网站| 青娱乐国产在线| 天天狠狠干| 悠悠影院欧美日韩国产| 欧美性猛交xxxx黑人猛交| 性福利影院| 国产日本久久久久久久久婷婷| 色黄视频网站| 夜夜爽8888| 久久成人国产精品免费| 日本三级吹潮| 一区二区三区免费| 男男全肉高h腐文| 天堂v| 在线欧美不卡| 日本免费a视频| 亚洲成a人片在线观看中文动漫| 久久精品最新免费国产成人| 天天做天天爱天天一爽一毛片| 99精品免费视频| 青草国产精品久久久久久久久| 污污网站国产精品白丝袜| sese综合| 日本视频网址| 中文字幕免费在线观看| 萝l在线精品社区资源| 四虎影院色| 种子在线搜索| 日韩一卡2卡3卡新区网站| 夜夜嗨视频| 日本高清在线3344www| 亚洲综合色丁香婷婷六月图片| 热久久这里是精品6免费观看| 在线观看黄色网| 青青草综合在线| 亚洲精品永久免费| 日本国产精品| 99香蕉国产|